INSIDE THE PROJECT

Opening up the source of the damage.

The sequence follows the sink cabinet and adjacent wall through containment, removal and access to concealed materials. Equipment views document the work area before the later repair.

A complete project sequence

Sixteen photographs and three videos follow the initial condition, containment, cabinet and wall removal, drying, and the repaired sink base.

See the finished kitchen

The final video walks through the repaired sink and cabinet interior.

Initial cabinet condition↗

01 · Initial cabinet condition

The cabinet end and surrounding floor before work.

Kitchen containment↗

02 · Kitchen containment

Clear plastic separates the kitchen work area.

Zippered access↗

03 · Zippered access

A zippered opening provides access through the barrier.

Damage beneath the sink↗

04 · Damage beneath the sink

Discoloration and deterioration around the sink plumbing.

Cabinet interior before removal↗

05 · Cabinet interior before removal

The sink-base interior before cabinet removal.

Preparing the sink base↗

06 · Preparing the sink base

The cabinet face and interior during preparation for removal.

Sink removed for access↗

07 · Sink removed for access

The sink opening provides access to the cabinet and wall connections.

Wall exposed behind the cabinet↗

08 · Wall exposed behind the cabinet

Removing the cabinet reveals the wall surface behind it.

Opened wall cavity↗

09 · Opened wall cavity

The opened wall exposes framing and existing plumbing.

10 · Exposed wall walkthrough

Video documentation of the opened wall and plumbing.

11 · Removed cabinet inspection

A closer inspection of the removed sink cabinet.

Air-filtration setup↗

12 · Air-filtration setup

Air-filtration equipment and ducting positioned in the work area.

Drying equipment↗

13 · Drying equipment

Drying equipment alongside the opened wall.

Protected kitchen work area↗

14 · Protected kitchen work area

A wider view of the plastic barrier around the kitchen work area.

Follow-up wall view↗

15 · Follow-up wall view

A later view of the accessible wall framing.

Exposed framing and plumbing↗

16 · Exposed framing and plumbing

The framing and plumbing at the follow-up stage.

Kitchen cabinet with countertop removed and plastic sheeting beside the work area

17 · Cabinet work area

Countertop removed for cabinet access, with plastic sheeting beside the work area.

Open sink-base cabinet showing disposal and plumbing

18 · Sink-base documentation

The sink-base cabinet interior, disposal, and plumbing documented in the project record.

19 · Completed repair walkthrough

The completed kitchen repair, including the sink and cabinet interior.

Enlarged project photograph

HAVE A SIMILAR PROPERTY CONCERN?

Talk through your next step.

323-673-3319
Call Marc · 323-673-3319